Senvion signs conditional contract in USA for 275 MW

Senvion signs conditional contract in USA for 275 MW Third large-scale order for 4.2M140 turbine within a month Senvion signed agreements for the supply and commissioning of 275 megawatts (MW) of wind turbines with the TG East Wind Project that is owned by Taaleri Energia Ltd. NorthRenew, a renewable energy development firm, will co-develop the project with Taaleri. Senvion will supply 58 Senvion 4.2M140 turbines with a hub height of 110 meters as well as ten Senvion 3.2M114 turbines at 93 meter hub height. Commercial operations will commence in 2020. The agreements include a 25-year full service operations and maintenance contract. The TG East Wind Project is located in Knox

Read more

Iberdrola, awarded 295 megawatts of wind power capacity in Brazil

  Iberdrola, through its subsidiary Neoenergia, was awarded 295 megawatts (MW) at the last wind power tender held by Brazil’s National Electric Energy Agency (Aneel). This is a major first step for Iberdrola in Brazil, after the consolidation earlier this summer of all its businesses under the new Neoenergia, in line with the growth plans set by the company. Neoenergia will build nine wind farms in the Santa Luzia area, in the state of Paraíba, which will become operational in January 2022. Thanks to these new facilities, Neoenergia’s wind power capacity in operation and under construction will now exceed 800 MW. Thus, Brazil becomes the strongest Latin American country in

Read more

Vestas wins largest order to date in India with 250 MW turnkey order from country’s first energy auction

Vestas’ extensive experience from around 4 GW of turnkey projects across the globe has secured the company its largest project in India to date. The record order is placed by Ostro Kutch Power Private Limited and awarded through India’s first wind power auction held in February 2017. The 250 MW turnkey order follows another 100 MW turnkey project in India earlier this year, taking Vestas’ order intake in the market to more than 480 MW in 2017. The project will be located in the Kutch district of Gujarat state and includes delivery, installation and commissioning of 125 V110-2.0 MW turbines, as well as the project’s civil and electrical works. The

Read more

Vestas receives 40 MW order in India

Atria Brindavan Power Private Limited has placed a 40 MW order for the second phase of the Basavane Bagewadi Wind Farm in the Bijapur district of Karnataka state. With this order, Vestas has cumulatively received 80 MW in orders from Atria for the project. The order includes supply and installation of 18 V110-2.2 MW turbines, a 15-year full-scope Active Output Management 5000 (AOM5000) service agreement as well as a VestasOnline® Business SCADA solution for data-driven monitoring and preventive maintenance. Commissioning is expected for the second quarter of 2018. “With this  second order from Atria in just over a month, Vestas underlines that we can provide reliable and competitive solutions along

Read more

Hywind Scotland inauguration positions Masdar at the forefront of floating wind technology

First Minister of Scotland Nicola Sturgeon officially opens world’s first commercial-scale floating wind farm, now supplying around 20,000 households Khaled Abdulla Al Qubaisi, Chief Executive Officer of Mubadala Investment Company’s Aerospace, Renewables & Information Communications Technology platform, and Mohamed Jameel Al Ramahi, CEO of Masdar, join Scottish government and Statoil officials at launch ceremony in Aberdeen 30MW wind park to be connected to 1MWh Batwind storage solution, further optimising output Aberdeen, Scotland; October 18, 2017 – Scotland’s First Minister Nicola Sturgeon and Norway’s Minister for Energy & Petroleum, Terje Søviknes, attended today’s formal unveiling of the world’s first commercial-scale floating wind farm, a renewable energy project which paves the way

Read more

ACCIONA opens the first plant with storage of wind energy using batteries in Spain, in the region of Navarra

The guest of honour at the opening ceremony was Manu Ayerdi, Vice-president for Business Development of the Government of Navarra Technical solutions will be applied in the plant for use in commercial wind farms, with the aim of increasing the contribution of renewables to the grid and optimising the management of the energy produced   Manu Ayerdi, Vice-president for Business Development of the Government of Navarra, and ACCIONA Energía CEO Rafael Mateo have opened the wind power storage plant with batteries that ACCIONA has put into service in Barásoain (Navarra). It is the first facility of its type incorporated into a grid-connected wind farm in Spain, with the idea of

Read more

ACCIONA Energía’s fourth wind farm in India enters service

Bannur (78 MW) raises the company’s capacity in the country to 164 MW The wind farm has 26 Nordex-Acciona Windpower 3-MW turbines ACCIONA Energía has put the 78-MW capacity Bannur wind park into service in India. It is the fourth owned by the company in the country, taking its operational capacity there to 163.8 MW. Located in Bijapur district in the state of Karnataka (south-west India), Bannur has twenty-six AW125/3000 Nordex-Acciona Windpower wind turbines (rotor diameter 125 metres) mounted on 120-metre high concrete towers. The new facility will generate an estimated 242 gigawatt-hours (GWh) a year, equivalent to the consumption of over 224,000 Indian homes and avoiding the emission of 232,562

Read more

Senvion installs first prototype of 3.6M140 EBC

Senvion installs first prototype of 3.6M140 EBCNew turbine ensures optimised output and quick installation for moderate wind speed sites Hamburg: Senvion, a leading global manufacturer of wind turbines, has successfully completed the installation of the first 3.6M140 EBC (Eco Blade Control) turbine prototype at the Windtestfeld Nord near Husum, in Schleswig-Holstein, for 4testwind GmbH. The Senvion 3.6M140 EBC is one of Senvion’s biggest onshore turbines designed for moderate and strong wind speeds. The new turbine is equipped with the innovative load-reducing pitch control system Eco Blade Control (EBC) technology which enables optimized load management even in challenging wind conditions. The 3.6M140 EBC also features a newly designed steel tower and

Read more

Siemens Gamesa successfully installs Asia’s tallest wind turbines in Thailand

The G114.2.0 and G114.2.1 turbines come with 153-metre tall towers The company has installed 33 turbines (67.5 MW) at the Sarahnlom wind farm in Thailand Siemens Gamesa has set a new record in Asia by installing this year the tallest wind turbines on the continent. The turbines are equipped with 153-metre tall towers, and with the 56-metre blades, they reach a total height of 210 metres. The project -owned by Thai engineering company Gunkul and being built by developer PowerChina ZhongNan- has total capacity of 67.5 MW; i.e. 33 units of the G114-2.0 and G114-2.1 MW models. Siemens Gamesa has already installed these 33 turbines in the Sarahnlom wind farm

Read more

Wind industry gears up for Spanish 4.1 GW deployment challenge: requests post-2020 visibility

WindEurope welcomes the 1.1 GW awarded to wind yesterday in the Spanish renewables auction. The figure adds to the nearly 3 GW wind won in the previous auction in May 2017. According to the Spanish Wind Energy Association (AEE), the installation of the projects accorded to wind this year (and in 2016) will translate into investments in excess of €4.5bn and the creation of 25,000-30,000 jobs during construction. “It is a positive signal for the wind industry, notably the Spanish supply chain,” said WindEurope Chief Policy Officer, Pierre Tardieu. “However, due to the four-year market standstill, we’re playing catch-up,” Tardieu added. “The Spanish government is trying to deploy in the

Read more